C2 approved four bedroom detached home in Solihull
Solihull, B91 · Midlands

Specification
| Reference | GK-086 |
|---|---|
| Location | Solihull, B91 |
| Region | Midlands |
| Planning status | C2 planning granted |
| Building type | Detached house |
| Bedrooms | 4 |
| Communal rooms | 3 |
| Plot | Corner property with an in and out driveway accommodating 3 to 4 cars. Large attached, extended garage. |
| Rent | Offers welcome |
| Available from | On application |
| Suitable for | Children's home |
| Full address | Released on registered interest |
About this building
A spacious detached corner property in Solihull with C2 planning permission for up to 3 children. Rent offers welcome. Viewings by arrangement.
Four bedrooms include two extended bedrooms with en suites and dressing areas. There is an upstairs family bathroom, a downstairs WC and a downstairs wet room with a shower and toilet.
Three large reception rooms provide generous communal space. The dual aspect reception room could be split into two rooms, subject to any required approvals and suitability checks.
The in and out driveway accommodates 3 to 4 cars. A large attached, extended garage provides additional space.
Compliance and condition notes
Solihull Metropolitan Borough Council granted planning permission PL/2026/00714/PPFL on 18 June 2026 for change of use from a C3 dwelling to a C2 care home for up to 3 children. No more than 3 children may be accommodated at any one time. Development must follow the approved plans and begin within 3 years of the permission date. A copy of the decision notice is available on registered interest. The supplied existing floor plan labels three bedrooms and a study, while the landlord describes four bedrooms. Confirm the current room arrangement at viewing. The existing drawing is numbered 681 3100 and is not one of the plans listed in the approval notice. The location plan is withheld publicly because it identifies the exact address.
These notes are what we know at the time of listing. They are not a survey, a fire risk assessment or planning advice. Verify everything that matters to your model before you commit.